Application Summary


Office ID: 03 Application #: 115045 File #: 19-H28
 
Project Name: Castaic Area High School
 
Project Scope: Construction of 1-Inc. #2: 11 Bldgs.(Adm.; Gym., Performing Arts; Food Serv., Lib/C.R., Storage, Techology & 4 CR Bldg.), Shade Struct. Water Tanks , Site work., 1-Inc. #1 : Site Work and Grading.
 
Address: Sloan Canyon Rd.
 
City: Castaic Zip: 91384    
 
PTN #: 65136-74 OPSC #:
 
Project Type: School (K-12) # Of Incr: 2
 
Project Class: Class 1 Special Type: NA
 
Estimated Amt: $75,000,000.00 Contracted Amt: $0.00
 
Construction Change Document Amt: $0.00 Final Project Cost: $0.00
 
Adj Est.Date#1: Adj Est.Amt#1: $0.00
 
Adj Est.Date#2: Adj Est.Amt#2: $0.00
 
Received Date: 3/26/2013 Approved Date: 9/21/2015
 
Approval Ext. Date: 8/8/2014 Closed Date:

Complete Submittal Received Date: 11/19/2013

SB 575

Auto Fire Detection Sprinkler System
Required
Included In Plan

Required review services

Special review type

Energy Efficiency
0%
0%

Climate Zone: 0 Project's Sq.footage: 0 EPR Approved Date:
 
HPI: HPI Points: 0 HPI Hours: 0
 
Energy Notes: HPI filing fee of $400.00 received and posted on 5/24/13.
 
Client's Notes: Add. docs. received (7/25/13)-Inc.1 Add. docs. received (11/19/13)-Inc.2 This submittal is incomplete for FLS compliance plan review. Resubmittal is required. All volumes + specs FLS check set #1 returned to the AOR 3/3/14-CO. The second submittal is again incomplete. Resubmittal for plan review is required. FLS back check should be allowed nor scheduled until FLS plan check is 85% complete. This school site is in a WUI high fire hazard zone and all buildings shall comply with 2010 CBC chap 7A.